New Zealand Aluminium Smelters Furnace Foundations
The construction of the Tiwai Point Aluminium Smelter Metals Products ‘X’ Furnace foundation was carried out during February and early March 2007. The project required a 12m x 8m x 4.2 deep insitu concrete foundation structure to be constructed in extremely difficult ground conditions and within metres of existing furnaces operating at temperatures of up to 750ºC.
To complicate matters further, our programme as the Main Contractor only allowed 5 weeks for the demolition, temporary works and foundation to be completed. Work also needed to be co-ordinated so as not to disrupt the hot metal carrier passage or production from the adjacent furnaces. Forming a dry pit inside a very congested and dangerous site within wet running gravels was always going to be a significant challenge.
The contract was completed to a high standard, within the five week programme and on budget. With just over 6,000 man hours required to complete this project there were no Health and Safety nor Environmental incidents.
CONTRACT VALUE: $ 1,164,000.00
CONTRACT PERIOD: 5 weeks
CLIENT: NZ Aluminium Smelters Ltd
PROJECT MANAGER: Bechtel
STRUCTURAL ENGINER : Sinclair Knight Merz Ltd
REFEREES:
NZAS Ltd
Doug Lindsay, (03) 218 5999
Becthel
Lindsay Buckingham
(03) 218 5830
AWARDS:
Gold Reserve Award
RMBF 2008 Commercial Project Awards