Milford Visitor Centre

This project involved the construction of the two new double leveled wings at either end of the existing Milford Sound Visitor Centre. The remote location and extreme weather conditions of the site required extensive logistical co-ordination to ensure that materials and manpower were on site as and when required. The existing Visitor Centre, which has around 2000 visitors through its doors per day, also had to be kept fully operational at all times. The building was of concrete floor and steel framed construction with aluminium cladding to the exterior.

CONTRACT VALUE: $2,120,000

CONTRACT PERIOD: 38 weeks

CLIENT: Milford Sound Development Authority

PROJECT MANAGER: McCulloch Architects Ltd

ARCHITECTS: McCulloch Architects Ltd

QUANTITY SURVEYOR: Southern Quantity Surveyors

ENGINEER: MWH New Zealand Ltd

REFEREES:

David Main

Southern Quantity Surveyors

John McCulloch

McCulloch Architects

Dave Inwood

Milford Sound Development Authority