Construction of new 15m high access tower, water services plantroom and structural slab to support the hydro slide structure.

Steel screw piling, significant concrete foundations were required along with a 500mm mass concrete slab over the slide structure area.  The site was very limited on space not only for the design proceed but also the construction phase.

Precise sequencing and planning was required as the only access and lifting area was directly over the structural slab area. The large water tanks and main slide water services were also position underneath this structural slab area.

The large concealed water tanks and water services were alos positioned underneath the structural slab due to the site restrictions.

A complex and unique build completed successfully by ABL.

JOB SPECIFICATION

Contract Value: $1.4m
Contract Period: 12 Months
Client: Invercargill City Council
Project Manager: Coombes Aquatic Limited
Quantity Surveyor: Southern Quantity Surveyors Ltd
Architect: Create Specialist Designers
Structural Engineer: Create Specialist Designers